Tower Cell over an in-ground tank
Products noted:
Case Study:
Fiberglass tower, pre-assembled pump deck, in ground tank
Key Points:
This extrusion company needed to replace their aging tower and at the same time increase capacity due to an expansion in production equipment. There was an existing in ground tank that would be utilized.
Problem
Advantage Engineering worked with the engineering department to size the system for the increased capacity. The pump deck was completely assembled at the factory prior to shipment so that the installation was greatly simplified.
Solution
Tower Cell
Product:
Manufacturer:

      Skiba